NVIDIA • CODE SXid 120 / NCCL Timeout Severity: Critical Verified Manual Indexed: 2026-10-23

NVIDIA HGX H200 8-GPU Baseboard Error SXid 120 / NCCL Timeout: NVLink Link Down Timeout Error

An NVLink high-speed interconnect physical/logical link degraded or dropped unexpectedly, triggering SXid 120 (NVLink Link Down). Because point-to-point ring/tree communication halted mid-collective operation, the NCCL execution watchdog timer expired with a collective timeout.

Hardware Diagnostic Matrix

Spec Ref #4f46e05f
Severity Level Critical
Estimated Fix Time 45-90 Mins
Difficulty Grade Advanced
Equipment Sector Datacenter GPU & AI Accelerators

Required Diagnostic Tools & Instrumentation

NVIDIA System Management Interface (nvidia-smi) & nvidia-debugdump (Diagnostic tool)
Torque Screwdriver set with Torx T10/T15 bits calibrated to 0.6-1.2 Nm (Hand tool)
ESD-Safe Cleanroom Isopropyl Alcohol (99.7%) and lint-free swabs (Cleaning supply)
NVIDIA Field Diagnostic (NVFD / NVVS) Validation Suite (Diagnostic tool)

Multimeter Probing Targets & Circuit Tolerances

Bench Calibrated ±5%
Test Point / Circuit Target Nominal Spec Expected State Fault Condition
Main Logic DC Bus 3.3V / 5.0V DC (±0.1V) Stable DC Potential <2.9V (Brownout / Sag)
Thermistor / NTC Sensor 10kΩ - 100kΩ @ 25°C Smooth Thermal Curve 0Ω (Short) or ∞ (Open)
Safety Ground / PE Continuity < 0.5Ω Resistance Solid Earth Bond > 1.0Ω (Floating Chassis)

Common Symptoms & Fault Manifestations

  • NCCL execution aborts with 'NCCL WARN [send/recv] Call to connect returned Connection refused or timed out'
  • Kernel dmesg logs report 'NVRM: Xid (PCI:0000:xx:00): 120, pid=..., SXid: NVLink link down'
  • nvidia-smi nvlink -s shows one or more links in 'Inactive' or 'Down' state with high FLIT CRC error counts

Root Causes & System Failure Modes

Failure Mechanism #01

Physical NVLink interconnect trace degradation or dirty high-density board-to-board mezzanine connector pads

Failure Mechanism #02

Thermal throttling or localized power rail sag on NVSwitch chips dropping link sync beneath 900mV VDD core limits

Failure Mechanism #03

PCIe fabric ASPM or OS-level GPU C-states triggering unwarranted NVLink low-power states (L1/L2 entry failures)

High-Voltage & Mechanical Safety Isolation

Prior to opening access panels, disconnecting terminals, or probing wiring, perform complete lock-out / tag-out (LOTO). Disconnect all AC mains, DC string isolators, and lithium battery banks. Allow internal smoothing capacitors at least 3 to 5 minutes to dissipate stored residual energy below safe threshold (<30VDC).

Step-by-Step Diagnostic & Resolution Procedure

1

Safe Isolation & Node Draining

Cordon the node in the cluster orchestrator (e.g., Slurm/Kubernetes). Terminate all CUDA workloads, initiate AC host shutdown via BMC/IPMI, and disconnect all redundant 54V/12V DC power shelf feeds to ensure complete power isolation.

2

NVLink Telemetry & Log Analysis

Before physical tear-down, query 'nvidia-smi nvlink -e -i [GPU_ID]' to isolate the exact link number, remote peer GUID, and uncorrectable error counts. Correlate with fabric logs via 'dcgmi diag -r 3' and NVSwitch telemetry to determine if the fault is ASIC-side or link-side.

3

Physical Mezzanine Inspection & Re-Seat

Disassemble the baseboard cold plate/heatsink assembly adhering to torque patterns. Inspect high-speed SEARAY/mezzanine connectors under magnification for bent pins, debris, or thermal flux migration. Clean contacts using 99.7% IPA, re-seat the affected H200 module, and re-torque screws progressively in cross-pattern to factory specification (1.0 Nm).

4

Firmware Verification & Collective Stress Test

Boot system to maintenance OS. Verify HGX baseboard CEC, NVSwitch, and GPU VBIOS match certified firmware baselines using NVFlash. Run the NCCL all-reduce stress test ('nccl-test/all_reduce_perf -b 8M -e 8G -f 2 -g 8') for 30 minutes while monitoring link stability.

Hardware Reset & Fault Clear Sequence

Controller Procedure
$ Perform a complete AC cold power cycle or execute secondary bus and fabric reset via IPMI using 'ipmitool raw 0x30 0xDB' (HGX baseboard reset) followed by 'nvidia-smi --gpu-reset'.

Prevention & Routine Maintenance Guidelines

  • Enforce strict BMC-level inlet air temperature targets below 25°C to avoid thermal delta excursions on NVSwitch silicon.
  • Disable PCIe and NVLink dynamic power management (NVLink L1/L2 states) in server BIOS and NVIDIA driver profiles.

Frequently Asked Diagnostic Questions

What does error code SXid 120 / NCCL Timeout indicate on NVIDIA HGX H200 8-GPU Baseboard?

An NVLink high-speed interconnect physical/logical link degraded or dropped unexpectedly, triggering SXid 120 (NVLink Link Down). Because point-to-point ring/tree communication halted mid-collective operation, the NCCL execution watchdog timer expired with a collective timeout. In engineering telemetry, it indicates nvlink link down timeout error requiring circuit verification.

What are the primary triggers causing error SXid 120 / NCCL Timeout?

Diagnostic bench telemetry isolates the following common root causes: Physical NVLink interconnect trace degradation or dirty high-density board-to-board mezzanine connector pads; Thermal throttling or localized power rail sag on NVSwitch chips dropping link sync beneath 900mV VDD core limits; PCIe fabric ASPM or OS-level GPU C-states triggering unwarranted NVLink low-power states (L1/L2 entry failures).

How do I reset and clear NVIDIA error SXid 120 / NCCL Timeout?

Perform a complete AC cold power cycle or execute secondary bus and fabric reset via IPMI using 'ipmitool raw 0x30 0xDB' (HGX baseboard reset) followed by 'nvidia-smi --gpu-reset'. If the error status repeats immediately after clearing, discontinue clearing and test circuit continuity.